Following is a detailed summary of the installation of a Lewmar V1 windlass in combination with a new bow roller to accommodate a 35# Manson Supreme anchor.
 
  
 
The anchor locker of a MK 1 is molded to accept two Danforth style anchors, apparently a “lunch hook” and a “big honkin’ one”. The dilemma was, there is no way to rapidly get the anchor overboard in case of emergency or to effectively manage the line. I don’t believe in lunch hooks, but wanted to retain the “big honkin’ one” as a secondary anchor.
 
 
Img003
 
 
The MK 1 “toy” bow roller with new Manson.
 
 
Img 005
 
 
Bow roller template made to determine the mounting location taking into consideration the existing cleat, bow pulpit, etc.
 
 
Img 007
 
 
Remove the vertical portion of the existing roller. A 4 ½” grinder with a stainless cutting wheel does the job. Be careful of the heat generated by cutting so as not to “cook” the fiberglass. Cut an inch and douse with cool water. Wait 5 minutes. Repeat.
 
 
Img010
 
 
With the vertical portion gone, place the new bow roller in position. Trace the edge of the new roller on the remaining horizontal piece to mark the next cut. Be careful not to cut the fiberglass under the existing fitting. Cut an inch and douse with cool water. Wait 5 minutes. Repeat…be patient.
 
 
Img020
 
 
Img030
 
 
Locate the mounting holes and drill. This would be a great location to oversize the holes, fill with epoxy and re-drill the next day. This is no place for a wet deck. 5200 is in order as well. If you can, tack weld the new roller to the existing stem fitting. Be sure to use a backing plate as the stress on the bow roller is very significant.
 
 
Img032
 
 
Img035
 
 
Rope / chain splice for smooth transition on the gypsy. I used 40 feet of ¼” G-4 high test chain spliced to 200 feet ½” 8 plait line. The V1 is available with a gypsy for 5/16” chain as well.
 
 
Img039
 
 
Templating the windlass platform.
 
 
Img040
 
 
 
 
 
 
1/8” stainless steel plate cut and broken to match template. I used 304 stainless…316 would have been the better option. Most machine shops consider this amount of material “scrap”.
 
 
Img043
 
 
Img047
 
 
The “dry fit” to determine the wiring location, wash down pump outlet location, and assure the “big honkin’” Danforth still fits…
 
 
Img050
 
 
Parting out the V berth…
 
 
Img060
 
 
Img070
 
 
Locate and drill bracket mounting holes.
 
 
Img080
 
 
¼” thick aluminum backing plate with countersunk holes to accommodate 8 ea. countersunk head 5/16” stainless fasteners.
 
 
Img090
 
 
I powered the windlass from the house bank. For the length of the wire run (approx. 60 feet from batteries to contactor to windlass and back), Lewmar recommended #2 ga. cable. I drilled 7/8” OD holes and inserted ¾” ID reinforced hose at bulkhead / locker penetrations as chafe protection along the run.
 
 
Img092
 
 
Somebody named Ron says “crimp for strength, solder for juice”. Crimp the cable to the connector, drill a 3/32 or so hole in the connector body, heat the connector with a soldering torch and fill with solder. Apply heat shrink tubing to seal the entire connection.
 
 
Img095
 
 
Img135
 
 
Lewmar supplied 90 amp circuit breaker located under the forward setee.
 
 
Img130
 
 
Contactor located under the V berth. I used a sealed oak block mounted to the hull with fast cure 5200.
 
 
Img100
 
 
Preliminary install…
 
 
Img140
 
 
Img150
 
 
 
Gussets welded on. Access holes for wiring / wash down pump.
 
 
Img160
 
 
Polishing process…
 
 
Img170
 
 
Img180
 
 
Img190
 
 
Img200
 
 
Chafe protection for wiring…
 
 
Img210
 
 
Final installation.
 
 
Img220
 
 
Deck mounted foot switches…this location worked nicely with the wire chase in the V berth. Another great location for the oversize/epoxy/re-drill and seal routine.
 
 
Img230
 
 
The windlass can be operated with only the stbd locker door open.
 